Press Releases

Water Transportation: Lagos Scales Up Work On Nine New Jetties, Four Ferry Routes

Completes Alpha Beach Shoreline Protection; Epe, Badagry Lagoon Reclamation, OthersĀ 

The Lagos State Government on Thursday said work is progressing steadily on the construction of nine jetties with shelter and shoreline protection and channelization of four new ferry routes as part of efforts to boost water transportation in line with the multi-modal transport policy across the State.

Speaking at the annual Ministerial Press Briefing to mark the third year anniversary of Governor Akinwunmi Ambodeā€™s administration held at the Bagauda Kaltho Press Centre in Alausa, Commissioner for Waterfront Infrastructure Development, Mr. Babatunde Adejare said the projects, upon completion, would transform water transportation and thereby contribute to the vision of the present administration to reduce pressure on road infrastructure.

The jetties under construction, according to Adejare, include VIP Chalet, Badagry; Apa Waterfront, Baiyeku Waterfront, Offin Waterfront, Isalu-Ajido, Badagry; Liado Waterfront, Amuwo-Odofin; Ilashe-Ojo Waterfront, Ito Omu Waterfront, Epe; and Takwa By Island.

He said: ā€œThe jetties which are at various stages of completion ranging from 90 per cent to six per cent, essentially involves the construction of modern concrete jetties with shelter and shoreline protection across the riverine areas of the State.

ā€œThe work done and on-going include construction of reinforced concrete jetty supported by 24 number of concrete piles, hydraulic sand filling to be paved using 60mm paving stone, chrome handrail with canopy over the jetty, fenced waiting area, street light, waiting shelter with concrete seats, toilets for male and female, soak-away, among others.ā€

Read:  NigeriaPresslog partners University of Sussex to launch #ThroughTheClutter, a pioneering media resource

On channelization of four new ferry routes, Adejare said the project was conceived to improve water transportation, adding that it would be completed with new world class comfortable ferries already ordered to be procured by the State Government to convey people through the waterways.

According to him, ā€œThe four channelization projects are at various stages of completion and are progressing satisfactorily with Ijede-Badore route at 40 per cent, Baiyeku-Ajah route at 70 per cent, Ebute Ojo-Marina at 60 per cent, and Ijede-Marina at 35 per cent completion.

ā€œThe projects involve the dredging of ferry routes, creating a path of 40meters width and four meters minimum depth to accommodate bigger boat movement. With the population of the State progressing numerically, there is the need to intensify and compliment the predominantly road based transportation in the State with water transportation in order to move large number of people from one point to another,ā€ Adejare said.

Read:  ā€œOur mission is to use technology and the internet to connect peopleā€- Jumia CEO

On other activities of the Ministry, the Commissioner said in response to challenges posed by climate change and global warming with attendant rise in ocean level resulting in coastal erosion, the State Government embarked on holistic measures to protect coastal communities, saying it was gratifying to report the completion of the first and second phases of shoreline protection from Goshen Estate to Alpha Beach in Eti-Osa Local Government Area.

He said the project was divided into three phases for ease of funding, with phase two involving construction of twelve Groynes which were completed in 2017, while phase three of the project involving construction of three new Groynes had reached 85 per cent completion.

Read:  New Era International Leadership Conference 2018

ā€œIn effect, about 7.2kilometer stretch of the shoreline has been protected against ocean surge. What I can assure Lagosians is that the projects would not be limited to Alpha Beach, it would get to our border with Ogun State,ā€ Adejare said.

Speaking on other projects, the Commissioner said the first phase of the reclamation and protection of Badagry Marina involving shoreline protection had been completed with additional 208 metres, while within the last three years, the government completed the delivery of Epe Marina, reclamation of Lekki Foreshore scheme, Orange Island and Alaguntan/Okunkobo/Olomometa in Ojo local government.

He listed other major projects ongoing to include Oworonshoki land reclamation, Eko Atlantic City, among others.

Responding to questions from journalists, Adejare said the State Government, through the Ministry, intensified monitoring activities involving dredging and operation of private beaches, adding that arrangements were being firmed up to engage professional beach guards to forestall any form of casualties.

Related posts

Africa Fashion Week London 2016 The Line Up

NigGal

Light Camera Hair 2016.

NigGal

Ringier Media Nigeria Limited Acquires My Africa – A Leading African Podcast

NigGal

Stanbic IBTC launches micro pension campaign with ā€˜Retire Wellā€™

NigGal

International Cuisine Expo

NigGal

Short And Long Hair Problems From Jiji

NigGal

Leave a Comment